Ductile Iron Double Flanged Pipe
   
Ductile Iron Spun Pipe
   
Ductile Iron Fitting
   
Cast Iron Double Flanged Pipe
   
Cast Iron Spun Pipe
   
Cast Iron Fitting
   
Sluice Valve
   
   
Hydro Project
We have commissioned 7.2 MW Birahi Ganga Hydro Electric Project located in Chamoli Distt of Uttrakhand, in Birahi Village on National Highway no.58 leading to Joshimath. It is approximately 7 Kms. From Chamoli & 9 kms. Before PipalKoti.  It utilizes  waters of Birahi Ganga - a tributary of river Alaknanda.  Average bed slope of Birahi Ganga from  Diversion site to Power House is about 1 in 20.   Power House for the Birahi Ganga SHP is just u/s of the confluence point of Birahi Ganga and Alaknanda Rivers on the National Highway NO. 58 leading to Joshimath.  The Project utilizes a Rated Head of 54.5 m, at a design discharge of 17.435 cumecs for a generation capacity of 7.2 MW (3 x 2.4 MW) plus 10 % overload.   It is estimated that in a 75% dependable year, the project will produce annual energy of about 39.78 million units.   Power will be evacuated to Chamoli sub-station Kothiyalsain at 33 kV, which is located about 13 km. from the powerhouse site.

With the announcement of policy of privatization, the Project was allocated to the Developers - M/s Birahi Ganga Hydro Power Ltd., 32-33 Kushal Bazar, Nehru Place, New Delhi.

The Project construction work was started during end of December 2005 and the project has been commissioned in the year 2011. The project has been installed with a project cost of Rs. 6500.00 lacs.  
The Developers assigned the consultancy work relating to survey & investigations and preparation of DPR as well as all other assignments leading to tendering, detailed engineering, supervision of construction, testing & commissioning and commercial production of power to an Indo-German Consultancy firm namely, Dr. Hutarew & Partner (India) Pvt. Ltd., New Delhi & Electro Mechanical machinery has been designed and supplied by M/s HPP Energy India Pvt. Ltd., New Delhi.
The site was visited by the experts of the Consultancy Company in May 2000 who ordered re-survey of the entire project area. This was considered essential in view of the damages occurring to the hill slopes after the 1999 earthquake of Chamoli.  It was earlier proposed to develop a 4.8 MW project. However, later on, looking at the encouraging flow conditions in the river, the installed capacity has been enhanced to 7.2 MW by adding one more machine of 2.4 MW capacity. It has been computed that the requisite design discharge for 3 Horizontal Axis Francis Turbine having Synchronous Generators machines (17.435 cumec inclusive of 10% overload) for 7.2 MW capacities plus 10% overload would be available for about 140 days in a 75% dependable year there by justifying the installation of third machine.
CORPORATE SOCIAL RESPONSIBILITY (CSR)

Birahi Ganga Hydro Power Limited while in phase of construction and later at the time of operation also is contributing its share for the social as well as economic development of the area. Some of the major contributions are as listed below:

(1) Employment to local people (UK) is 91.43% of the total people employed.
(2) Several works were awarded to local contractors during construction & also during operation period who deployed local labors for the work.
(3) Water pipeline has been laid which is supplying water to the entire Birahi Village.
(4) Birahi Ganga has contributed in development of Srikot village by helping them financially in constructing Boundary wall of their Forest land, Dharamshala and Temple.
(5) For Char Dham yatra company has constructed water drinking station at pipalkoti & Chamoli.
(6) The list is long but BGHPL is committed for social as well as economic development of the Local society.